We moved into our new build home from Bellway in February 2024. This page is a plain, factual record of what has happened since. It is not written to cause drama. It is a timeline of forgotten repairs, complaints about out of plumb walls that were not addressed, and the NHBC claims and inspections that are still ongoing. We are keeping it here so other homeowners, prospective buyers, and anyone following the situation can see the sequence of events clearly.
TIMELINE OF EVENTS
What happened, in order
REPAIRS AND DEFECTS
The key defects
- Out of plumb walls
- Cracked bricks
- Inconsistent per joints and beds
- Use of 3/4 bricks and still large prep joints
Several agreed repairs were forgotten and never completed. Our complaints about the out of plumb walls were ignored rather than answered. We are listing the defects here in the same terms we reported them, so the record is consistent.
NHBC CLAIMS AND INSPECTIONS
Where the claims stand
After the defects went unresolved with Bellway, we raised a claim with the NHBC covering the reported items, including the out of plumb walls and the brickwork. Inspections were arranged and carried out to assess the defects. We attended and provided the details we had recorded. So far these claims and inspections have not produced a clear result. We are continuing to follow up and will keep this record updated as things move.
CURRENT STATUS
No clear outcome yet
The defects remain, the claims are open, and the inspections have not given us a resolution. We will update this page as the situation changes.